One project, three ways it pays back
Five ways to add a home
Each type has its own page with floor plan sizes, pricing, timeline and the trade-offs to know before you decide.
Detached ADU
A freestanding one- or two-bedroom home with its own entry, kitchen and bath. The most private option and the strongest for rental income.
Attached ADU
Built onto the side or rear of your home, sharing a wall but not a living space. Ties into existing utilities, which keeps site work down.
Garage Conversion
We keep the existing slab and walls where we can, then insulate, re-frame openings and add a kitchen and bath. Often the fastest path to an ADU.
JADU
A junior ADU carved from an existing bedroom or wing, with an efficiency kitchen and its own entrance. Bath can be private or shared.
Second-story ADU
A new unit above your garage or as an upper level, with its own stair and entry. Ideal for smaller lots where yard space matters.
Compare ADU types
| Type | Size | Where | Build time | Est. per sq ft | Best for |
|---|---|---|---|---|---|
| Detached ADU | Up to 1,200 sq ft | Backyard | 6–9 months | $300–$375 | Rental income, guest house |
| Attached ADU | Up to 1,200 sq ft or 50% of the home | Side or rear of house | 6–9 months | $285–$355 | Multigenerational family |
| Garage Conversion | Existing footprint | Attached or detached garage | 4–6 months | $190–$250 | Lower cost, faster build |
| JADU | Up to 500 sq ft | Inside the main house | 3–5 months | $170–$230 | Aging parents, adult kids |
| Second-story ADU | Up to 1,200 sq ft | Above garage or home | 8–12 months | $340–$420 | Small lots, views |
Illustrative Southern California ranges at standard to premium finish. Site work, utilities and city fees vary by lot.
From first visit to permit, we handle the city
Site visit
We walk your lot, check setbacks, utilities and access, and tell you which ADU types qualify.
Design
Floor plan, elevations and finishes, drawn around how you plan to use the unit.
Engineering
Structural, Title 24 energy and soils reports, coordinated by our team.
Plan check
We submit to the city, answer corrections and track every comment until approval.
Build
Our own crews build it, with a project lead on site and weekly updates.
Final & move-in
Final inspection, certificate of occupancy and a walkthrough before handover.
What will your ADU cost?
Illustrative ranges for Southern California. Site work, utilities and city fees vary; your exact price comes after the site visit.
Estimated build cost
Build now, pay later
ADU questions, answered
Tell us about your property and an ADU specialist will call to schedule your site visit.







