Your ADU, built start to finish
Pacific West designs, permits and builds accessory dwelling units across Southern California. Scroll to watch one go up.
Five ways to add a home to your lot
Not sure which fits your property? We confirm setbacks, utilities and zoning in a free site visit.
Detached ADU
A freestanding one- or two-bedroom home with its own entry, kitchen and bath. The most private option and the strongest for rental income.
Attached ADU
Built onto the side or rear of your home, sharing a wall but not a living space. Ties into existing utilities, which keeps site work down.
Garage Conversion
We keep the existing slab and walls where we can, then insulate, re-frame openings and add a kitchen and bath. Often the fastest path to an ADU.
JADU
A junior ADU carved from an existing bedroom or wing, with an efficiency kitchen and its own entrance. Bath can be private or shared.
Second-story ADU
A new unit above your garage or as an upper level, with its own stair and entry. Ideal for smaller lots where yard space matters.





From first visit to permit, we handle the city
Site visit
We walk your lot, check setbacks, utilities and access, and tell you which ADU types qualify.
Design
Floor plan, elevations and finishes, drawn around how you plan to use the unit.
Engineering
Structural, Title 24 energy and soils reports, coordinated by our team.
Plan check
We submit to the city, answer corrections and track every comment until approval.
Build
Our own crews build it, with a project lead on site and weekly updates.
Final & move-in
Final inspection, certificate of occupancy and a walkthrough before handover.
ADUs we’ve built
What will your ADU cost?
Illustrative ranges for Southern California. Site work, utilities and city fees vary; your exact price comes after the site visit.
Estimated build cost
Build now, pay later
Remodels & additions
ADU questions, answered
Most single-family lots in California qualify. State law allows an ADU and a JADU on most single-family lots. We confirm setbacks, utilities and zoning during a free site visit.
Often not. California waives ADU parking in many cases, including lots within half a mile of public transit and garage conversions.
Only the new ADU is assessed and added to your existing assessment. Your main home is not reassessed.
Yes. ADUs can be rented long-term. Many cities restrict short-term rentals under 30 days.
Yes. We manage design, engineering, city plan check and permits, and meet the inspector on site through final.
We work with lending partners that can fund construction with no money down, so payments start on a schedule you approve. Terms depend on credit and property.

Tell us about your property and an ADU specialist will call to schedule your site visit.


























